Skip to content

Manufacturing in Depth

“Why is the cost on my document different from what I paid for the item?” For an item you make, it is because finalising one production step takes its materials out of stock and puts the item it made in, and carries none of the materials’ cost across; nothing in the module posts a journal. This page is for the production planner, the floor supervisor and the accountant who values what came off the line: what each of the four manufacturing applets records, what one FINAL moves and at what value, what reaches the ledger, and how you know a job ran. The module’s front door is the Manufacturing module page.

What each applet records

AppletWhat it records, behind the screen
Process MaintenanceThe recipe: machines, process types, a process template per step (its input and output items, each with a Ratio) and a job template per finished item, whose groups the backend derives by walking from the templates that output the item down through their inputs. Master data; it moves no stock
Production Planning and MonitoringThe plan: a job order for a quantity of one item, its generated process instances (one per step), its links to the sales-order lines it serves, and stock reservations. Its Production Request screen writes a status on a sales-order line and creates nothing
Manufacturing OperationsThe floor: operators’ work logs against a process instance, the supervisor’s approval of each log, and the supervisor’s FINAL, the step that moves a job’s stock
Packing Order Applet (Internal)The pack: a packing order knocked off from a sales order, the pick-pack queue its Final fills, and the supervisor approval that records the packed bins and releases the sales order’s stock reservation. Quantity and amount signum 0 — the packing order neither moves stock nor posts. Its Auto Coil screens finalise a coiling instance, which moves stock by a route of its own (below)

Supporting applets, owned by other modules and used here

AppletOwnerWhy manufacturing needs it
Stock BalanceInventoryWhere you see what a FINAL did, and each location’s moving-average cost — which a Reset MA does not change: it sets the company figure a sale reads
Stock AdjustmentInventoryReset MA, where the accountant gives a finished item the cost of what went into it
Stock ConversionInventoryLight kitting without a job order — input and output lines on one document at one location
Stock Reservation AppletInventoryThe bin-level reservation the job order’s stock-planning screen writes, and the clean-up job that deletes it once expired — where that job is scheduled
Sales Order (Internal)SalesWhere demand comes from: a sales-order line’s MRP tab requests production and links the line to a job order; MRP_MANDATORY_FOR_NON_FINISHED_GOODS (with ENABLE_MRP_JOB_ORDER_LINK) makes the screen require a Requested status — not a job order — on lines without the Fast Moving Goods label
Inventory Item MaintenanceCoreThe item’s Process Template tab lists every template that uses it, with a Replace action
Chart of AccountFinancial AccountingThe WIP tab of the Closing Stock Balance, where a work-in-progress figure for the month goes (see What posts to the ledger)
Bundles and grouped itemsInventoryThe other way an item is made of other items, and the one most businesses meet first: a bundle has no stock of its own, and its availability is the smallest of (each child’s balance at this location ÷ how many the bundle needs). Read it before you reach for a process template — and it is the page that explains “there’s not enough stock for bundle item”, an error that names the parent and never the child that ran out

What moves stock, and at what value

Only one event in the module changes a stock balance: finalising a process instance. For a job’s steps, the Supervisor PI screen in Manufacturing Operations sets the instance to FINAL, which queues the finalisation job. That processor takes every process-instance line marked INPUT out of stock (quantity signum −1) and every line marked OUTPUT into stock (quantity signum +1) at that line’s branch and location, by the line’s actual quantity, as ordinary inventory transaction lines; it then sets the next instances in the job to READY once every instance in the current stage is FINAL, marks the instance POSTED, and releases the bin locks the input bins held.

Each of those transaction lines is written with an amount of zero, but the amount is never read: a process-instance line carries none of the document types whose amount enters the moving average, so every item is costed at its own unit cost at that location. The inputs leave at their running average; the finished item comes in at the unit cost it last carried there — zero only if it has never been costed at that location. Neither unit cost moves. What is lost is the transfer: the inputs’ cost leaves inventory and the finished item never receives it. So the cost of a manufactured item is whatever it carried before the job, and if you want it to carry the cost of what went into it, set it deliberately with Reset MA in the Stock Adjustment applet.

No other document in the module touches stock. The job order (INTERNAL_JOB_ORDER) and the packing order (INTERNAL_PACKING_ORDER) both carry quantity and amount signum 0. A work log records quantities but writes no transaction line; only the totals on the instance lines at finalisation count.

Two further document types exist by name — INTERNAL_PRODUCTION_ORDER and INTERNAL_PLANNED_ORDER — declared in the document-type list with short codes, but no applet, handler, validator or posting uses them. They are declared, not implemented; do not plan around them.

A coiling instance takes a shorter route. On the Packing Order applet’s Auto Coil Supervisor screen, Final saves the instance as FINAL and POSTED and then asks the server, in the same press, to write the stock lines at once: the same input-out, output-in lines at an amount of zero, so the same cost result. The finalisation job never runs for it, so nothing sets a next stage READY and the locks on its input bins are not released: they keep coming off those bins’ Base Qty. The packing page’s Coiling process instances has the detail.

What one FINAL sets off, and what it does not

On a sales or purchase document, Finalise starts a chain: a primary job that fans out into stock, the journal and the other subsystems, after which the cost is written back onto the document’s own lines. A job step’s FINAL is much smaller (a coiling Final, above, is different again), and the difference explains most of what surprises people about this module:

  1. The status is saved first, and the work is queued after it. The screen returns as soon as the instance reads FINAL; the stock has not moved yet.
  2. One finalisation run writes the stock lines, then queues one stock-balance update per line — the same processor every stock document feeds. Stock Balance changes when those have run.
  3. The lines are dated when the run executes, not on the work-log dates and not on the job’s dates.
  4. Nothing else. No journal, no e-invoice, no cost written back: the stock lines point at the process instance, not at a document line. And no void: changing the instance’s status afterwards does not run the finalisation again or reverse its stock lines.

The date is the one that catches accountants. Two shifts worked on the 30th and finalised on the 2nd are next month’s stock movement: a stock report as at the 30th does not show them, and this month’s close is taken without them. If the period’s production matters to the close, the supervisor finalises the period’s instances before the accountant runs the close — that is an agreement between two people, not a setting. Finalising in time is not quite enough: the dated stock reports and the close pick a finalisation up only from the item’s next ordinary line (Reports).

A job at GadgetSphere Distribution, in ringgit

GadgetSphere Distribution (GSD) assembles a house-brand braided charging cable in a workshop at its Klang Valley warehouse, GS-KV-01 — the job the use cases trace step by step. Here are the numbers a first run of 2,000 cables produces. The figures are illustrative; the mechanism is the one above.

Step finalisedWhat leaves stockWhat enters stock
Cut4,100 m of bulk cable at its running average of RM 0.60/m — RM 2,4602,050 cut lengths at RM 0, because they have never been costed at GS-KV-01
Coil2,050 cut lengths at RM 02,050 coils at RM 0
Pack-test2,000 coils at RM 0; 4,000 connectors at RM 0.20 (RM 800); 2,000 retail boxes at RM 0.02 (RM 40)2,000 finished cables at RM 0

After the last FINAL, Stock Balance at GS-KV-01 holds RM 3,300 less material and 2,000 finished cables valued at nothing, plus 50 spare coils at RM 0. If Sales invoices the 2,000 cables to the corporate customer at RM 4.50 each, the invoice’s cost of goods reads RM 0 and the sale shows a margin of RM 9,000 instead of RM 5,700.

The accountant’s job is to stop that before the invoice. Decide what a finished cable cost — RM 1.65 in materials (RM 3,300 ÷ 2,000), plus labour and overhead if your policy absorbs them — and set it with Reset MA. That resets the item’s moving average across the company and posts its own journal — here RM 3,300, the new total cost less the old one — to the stock account against the company’s RESET_MA account, so it is also the step that puts a value on the finished cables in the ledger. A second run of the same cable then comes in at RM 1.65, the cost it carries by then, whatever its materials cost that time — so revisit the figure when material prices move.

What posts to the ledger

Nothing. Journal posting has no rule for any manufacturing record or for the job order or packing order. There is no absorption of labour or machine time, no standard cost and no variance, and no manufacturing record writes to a work-in-progress or cost-of-goods-manufactured account. The module gives you the quantities, not the values. What the ledger sees of production is what the ordinary documents around it post — the purchase invoice that brought the raw material in, the sales invoice that sends the finished item out. The only production-related journals in the ledger are the ones a person causes: the Reset MA that costs the finished item, and the month-end closing values below.

Where a work-in-progress figure goes instead

If your accounts carry work-in-progress, BigLedger has a place for the figure — in Financial Accounting, not here. The Chart of Account applet’s Closing Stock Balance has a WIP tab per fiscal year (shown only when SHOW_WIP_STOCK_VALUE is on), and Month End Processing posts the month’s selected WIP value as a closing-stock journal: debit the company’s STOCK_BALANCE_WIP account, credit COGS_WIP. Tick Select Manual and key the value: the close posts only a non-zero WIP value. Map both default GL codes on the company before the first close.

Nothing in the manufacturing module computes that value. The accountant works it out at each month end from the job orders still open, the steps already finalised and what their materials cost, then keys it. Read the journal the first close writes before you rely on it: the close posts the figure you key as it stands, so decide with your auditor whether you key the month’s balance or its movement.

Where the production figures come from

FigureWhere you see itHow it is made, and when
The finished item’s unit costThe company figure on a new Reset MA form (what a sale reads); Stock Balance shows each location’sNot from the job. Whatever the item carried at that location before the FINAL — RM 0 for a first run — until someone sets it with Reset MA
Planned input and output quantitiesA process instance’s input and output linesStored at the time the instances are generated: each line’s Ratio × the job order’s quantity. Changing the job’s quantity afterwards queues a background re-scale that works from the last step down, so the two methods agree only while output ratios are 1; a template edited later does not reach instances already generated
What left and entered stockStock Balance, after the runThe actual quantities on the instance’s lines — the totals of the bins chosen and declared — not the planned quantities and not the work logs
The date of that movementStock Balance, once the run has finished; the dated reports only from the item’s next ordinary line, and the Stock Movement Report lists no finalisation line at all (Why Stock Balance shows production the month-end figures leave out)The moment the finalisation run executes — not the work-log or job dates
Base Qty when choosing an input binManufacturing Operations › Select Bin No.Recomputed each time: the bin line’s quantity less reservations and every active bin lock, including locks this job already holds (FAQ: physical stock that is not available)
Worklog TotalAn output lineThe sum of Quantity Produced over the work logs not REJECTED or REWORK — so a PENDING log counts as well as an APPROVED one. It moves no stock
Quantity Produced DiscrepancyA work logWorked out on the operator’s form only, as target minus produced. A quantity the supervisor corrects leaves the old discrepancy on the log, so compare the two quantities when approving
Outstanding and net outstandingThe Outstanding Report, and the Packing Order applet’s Auto Coil SupervisorTwo figures that disagree: the one Auto Coil Supervisor fetches for an output line is the ledger at that line’s location less open quantity on FINAL sales orders; what the Outstanding Report’s Outstanding Qty counts, and why not to plan from it, is set out in Manufacturing reports
Job order statusMaster ListTyped on the form; saving COMPLETED is not checked against the job’s process instances
What a sales-order line counts as packedThe packing order’s KO For Sales Order tabRaised the moment a line is knocked off, before the packing order is saved; lowered by Discard or Void, each in its own partial way. An abandoned draft leaves it high
Work-in-progress on the balance sheetLedger and Balance SheetThe value keyed on the Closing Stock Balance WIP tab, posted by Month End Processing

Statuses and approvals

A job order and each of its process instances carry a process status from one list: REQUESTED, REJECTED, PLANNED, READY, IN_PROGRESS, COMPLETED, ON_HOLD, CANCELLED, EXPORTED, FINAL, PENDING_APPROVAL. The server’s one rule between them — no COMPLETED job order while an active process instance is not COMPLETED — sits on a status route that no screen calls, so a job order can be set to COMPLETED with instances still open, and the check is the planner’s; the rule, its message and the check are told once on the planning applet’s Job-order status, and the COMPLETED rule the form skips. The word is literal — a finalised instance reads FINAL, which is not COMPLETED, so the supervisor moves each finalised instance on to COMPLETED first. Every other transition is the applet’s choice; the applet pages say which buttons set which status.

Each work log carries its own approval status — PENDING, APPROVED, REJECTED or REWORK — set by the supervisor, and each change writes a historical copy of the log. The finalisation run does not read it: an instance finalised over a PENDING log moves its lines anyway. The module’s only other approval is the packing supervisor’s Approve on a packed line. Neither uses the generic approval engine, which runs its full loop for Purchase Order and Purchase Requisition only (Stock Requisition has its settings but no submit step, a known gap), and the packing order’s Workflow Settings screen is the ordinary Workflow Design custom-status mechanism, not an approval.

What the module has no engine for, and who does that job

Written down because most descriptions of an “MRP module” assume these, and because each one is still somebody’s job:

  • Material-requirements planning. “MRP” in BigLedger is the name of the backend package and of the job-order link on a sales-order line. Nothing explodes a bill of materials into purchase requisitions, nets demand against stock, or schedules by capacity. The planner does it: Stock Balance and the Outstanding Report’s Balance Qty against the open sales orders, weekly, and raises the purchases in Purchasing — by hand, or from each location’s minimum and maximum levels through the Stock Replenishment applet.
  • Multi-level bills of materials. A process template’s input items are one level; a job template chains templates. Whoever owns the recipe keeps each level as its own template and checks the chain on the item’s Process Template tab before a job is raised.
  • Costing the output. No step transfers the materials’ cost. The accountant decides the finished item’s cost after each first run, sets it with Reset MA, and confirms the company figure on a new Reset MA form before the first sale.
  • Work-in-progress, absorption, standard cost and variance. The accountant computes them outside BigLedger from the work logs and the material costs, and keys the month’s WIP value where What posts to the ledger says. Absorption and variance, where your accounts need them, are a manual journal in Financial Accounting built from those quantities, on the policy you agree with your auditor.
  • Machine capacity, downtime and utilisation. A machine is a master record and a field on a work log. The production supervisor keeps capacity in the schedule they plan from; the work logs give which machine and how long, not what it could have done.
  • Approval of anything but a work log or a packed line. Whoever holds SHOW_SUPERVISOR_VIEW is the control: keep it to the people who should press FINAL, and agree “no FINAL over a PENDING log” with them.

How the pieces depend on each other

  • Must exist first. Every input, output and finished item in Inventory Item Maintenance; a process template whose output is the finished item, or the job template stops with “No BOM options found for this item”; a job template, or the job order form has no group to offer; machines typed Packing for the packing screens, which list no other; bins at the job’s location; the SHOW_SUPERVISOR_VIEW client-side permission for whoever presses FINAL, or Supervisor PI opens on 404; for packing against a sales order, a Doc Flow row from the sales order to the packing order in Organisation, or there is no KO For tab. The Configuration page lists each with its symptom.
  • What a finalised instance makes possible. The finished item is in stock for Sales to deliver and invoice, and for the packing desk to pack; the next stage’s instances turn READY; and the work logs and actual quantities become the only record a manual cost or WIP calculation has to go on.
  • Siblings, and when to choose which. A bundle when the item is never made at all, only sold as a set; for everything else, the table in Choosing a manufacturing tool for the job below.
  • What breaks elsewhere if this is wrong. A finished item sold before anyone costs it overstates the margin in Sales by the materials’ cost. A job finalised after the close shifts its stock movement into the next month in Financial Accounting. Another item’s group on a job order consumes the wrong materials from Inventory. A packing approval releases the whole sales order’s reservation, so lines still waiting to be packed lose their hold on the reserved figure, while its other bin links go on holding their bins. A scrap lock left unwritten overstates stock, and understates the cost of sales, until somebody adjusts it out.
  • Used together. Sales Order (Internal), Production Planning and Monitoring, Manufacturing Operations and Packing Order, in that order, on a make-to-order job — alongside Stock Adjustment’s Reset MA after each first run, a Stock Reservation on the day a job starts, and the Closing Stock Balance at month end.

Choosing a manufacturing tool for the job

You want toUseRather than
Describe how a product is made, onceA process template per step and a job template per finished item, in Process MaintenanceBuilding each job order’s steps by hand with the + button
One step at one location with no machine and no operator — a kit, a relabelStock Conversion, one document — but read its page before you rely on it: today its FINAL moves no stock at all, and once it does, no cost passes from components to kit either (Best practice 9: Stock Conversion for a repack, a job order for a route)A job order, which needs a recipe, instances, work logs and a supervisor
Make a sales order’s line, and trace the job back to itThe line’s MRP tab set to REQUESTED by Sales, then a job order in Master List with the line added on its Sales Order Link tabApproving the production request and waiting for a job order: approval creates nothing
Hold material for a job that runs laterA stock reservation, from the bin grid of the production request’s Stock Planning tab or the Stock Reservation applet. The one the bin grid writes expires at midnight at the end of the day it is made, and the expiry acts only where the clean-up job is scheduled, so make it on the day the job runs and release it if the job moves (Best practice 7: do not count on the stock reservation’s expiry)The job-order temporary reservation in that tab’s upper grid, which earmarks part of a job order’s output for the line rather than material, never expires, and is best treated as a note
Record what was packed against a customer’s orderA packing order knocked off from the sales orderA packing order built by item search, which leaves the sales order’s packed quantity untouched
Write scrap offScrap on the packing order’s Operator Queue tab, and then an adjust-out in Stock Adjustment at period end (Best practice 10: take the scrap out of stock yourself)Trusting the scrap lock, which only holds the quantity back from the bin pickers and leaves it in stock at full cost

When manufacturing goes wrong

What you seeWhyWhere it is fixed
A manufactured item shows a cost of RM 0, or its sales margin looks too goodFinalisation carries no cost to the output, and it had never been costed at that locationA manufactured item shows RM 0 cost, or its margin looks too good
A stock report as at month end leaves out production you know was doneEither the instances were finalised after month end (the stock lines are dated when the finalisation run executes), or they were finalised in time and the item had no ordinary line — a sale, a receipt, an adjustment — between the FINAL and month end: the dated reports and the close take the balance from the item’s last ordinary lineFinalise the period’s instances before Month End Processing; a late one stays in the month it was finalised. For the second cause, run the accountant’s check in Reports before the close
FINAL was pressed and Stock Balance has not movedThe run is queued after the status saves; it has not run yet, or it failed before marking the instance POSTEDReopen the instance: a live FINAL button means it is not yet POSTED — Manufacturing Operations, What FINAL does
A job order reads COMPLETED with instances still openThe Master List form saves the status without checking the instancesMove each active instance to COMPLETED first — best practice 4
Production Request is empty although orders are confirmedA line appears only when its MRP tab reads REQUESTED, and that tab shows only with the Sales Order’s Enable MRP job order link onPlanning applet, Troubleshooting
APPROVED a production request, and no job order appearedApproval writes a status on the sales-order line and creates nothingRaise the job order in Master List and link the line on its Sales Order Link tab
The sales-order screen will not save a line until its MRP status is setMRP_MANDATORY_FOR_NON_FINISHED_GOODS with Enable MRP job order link, on an item without the Fast Moving Goods label. Any of the three statuses at REQUESTED satisfies it; no job order is required, and orders arriving through the API are not heldSet one of the three statuses to REQUESTED; items carrying the Fast Moving Goods label are exempt
Operator PMC is emptyNo instances generated for the job order, or the remembered search filters are still onGenerate the instances; clear the filters
FINAL is greyed outAn input or output line has no bin or no actual quantity, or the instance is already POSTEDFill both tabs — Manufacturing Operations, What FINAL does
A drum on the shelf offers less than it holdsReservations and bin locks, including this job’s own, come off Base QtyGo by Base Qty; finish or release the job holding the lock
A bin still offers less after a coiling instance was finalisedA known defect, which BigLedger is tracking: a coiling instance’s Final does not release its input bins’ locks, as a job step’s FINAL doesUntil it is fixed, note the bins affected and report them to your BigLedger contact; none of these pages documents a way to remove the locks
The stock that left is not what the operator asked forA part-drawn bin is recorded as whole containers plus one cut container, which equals the request only on a single-container binCompare the Bin No Listing with the request before SAVE, and before anyone presses FINAL
The reservation was gone when the job ranThe bin grid’s reservation expires at midnight at the end of the day it is made, and your tenant runs the clean-up job that deletes expired onesRe-reserve on the day, and have the reserved figure checked: the clean-up job deletes the reservation without taking its quantity off the reserved figure (Expiry and temporary reservations)
Stock is still held for a job that was cancelled or movedThe expiry acts only where the clean-up job is scheduled; nothing schedules it for youRelease the reservation in the Stock Reservation applet
A packing order’s Operator Queue stays empty after FinalOne line failed the first queue step, so none moved onThe order is voided and raised again — packing, What Final does
Approve on a packing line does nothing, or shows a general errorNo length marking on the row; or no acceptance criterion, so the completion test errors after the balance is writtenAdd a marking; set the criterion before approving — packing, Supervisor approval
A reservation was released after only one line was packedThe first approved line marks the sales order’s whole reservation released, which takes its full quantity off the reserved figure; its other bin links stay reserved and keep holding their binsCheck the reservation’s remaining bin links in Stock Reservation before re-reserving; next time raise one reservation per sales-order line if lines are packed at different times
Scrap keeps piling up in stockA scrap lock holds the quantity back from the pickers; it is not a write-offAn adjust-out at period end — best practice 10
The balance sheet shows no work-in-progress after the closeNo WIP value keyed, Select Manual not ticked, the value is zero, or the WIP default GL codes are not mappedThe Closing Stock Balance WIP tab in Chart of Account, then Month End Processing again

How you know a job ran

After each FINAL, about a minute:

  1. Reopen the instance on Supervisor PI. FINAL is greyed once the run has marked the instance POSTED. If it is still live, the run has not finished.
  2. Open Stock Balance at the job order’s location. Each input item has fallen, and each output item risen, by the instance’s actual quantities.
  3. Read the finished item’s company cost, the figure a sale reads: a new Reset MA form for the item shows it without being saved. RM 0 or last run’s figure means nobody has costed this run yet (the one-minute check). Stock Balance’s MA Price is the location’s figure, and a Reset MA does not change it.
  4. Before you complete the job order, open its Process Instance tab: every row with Active? ticked reads COMPLETED.

At each month end, before the close, the accountant adds two: no instance of the month is still waiting for FINAL, and the WIP value on the Closing Stock Balance is the one you worked out. The module’s three checks worth doing carry the weekly and period-end versions.

Two applets that cannot be installed

An internal kitting applet and a process-monitoring applet exist but cannot be installed from the Applet Store; Built, but not in the registry names them and says why they have no page. A second build of the planning applet also exists; which build your tenant is served is a question for your BigLedger contact — see the planning applet’s page.

Read next

  • Use cases — the four shapes the module is used in, each with who does the job and how they know it went right.
  • Best practices — the habits that follow from this page, starting with costing the output yourself.
  • Manufacturing reports — where each production figure comes from, and the accountant’s month-end check.
  • Core concepts — template, job order, process instance, work log, packing order.
  • Configuration — what must exist before the first job order finalises cleanly.